This car park in South Ockendon was concreted over 600 square metres. Steel mesh was laid across the prepared ground and timber edges were set around the bays before the pour.
60 cubic metres of concrete were brought in by concrete lorries and poured with a concrete pump. Six concrete finishers, including Krishan, levelled the slab. An Easy finish tamper was used to give the final finish to the slab. The job was finished in a day.